Hawkins Point Road Widening Project - 2013

Baltimore City, MD

Sabra & Associates, Inc. (SAI) was responsible for designing and developing plans, specifications, and cost estimates for relocating and converting BG&E’s overhead electrical system to an underground conduit system (to be owned by the City), new streetlighting, new drainage structures, MOT and pavement marking.

 

  • Electric Conduits
  • Lighting, Civil, Structural and MOT

This project is located in the southeast corner of Baltimore City, east of Curtis Creek and just south of I-695.   The project encompasses approximately one mile of Hawkins Point Road between Chemical Road and Quarantine Road and involves the realignment / reconstruction / widening of Hawkins Point Road over CSXT RR tracks, including the replacement of the existing deteriorated bridge (built in 1932).

The design phase is approximately 90% complete and is currently on hold pending the City’s acquisition of the remaining ROW easements.

  • Electrical Conduit Design
  • Utility Hanger Design
  • Lighting Design
  • Drainage Improvements
  • MOT & Pavement Marking
  • Cost Estimate
  • Specifications
  • Private Utility Coordination
  • Construction Phase Services

 

Headquarters
Columbia Maryland

7055 Samuel Morse Drive
Suite 100
Columbia, MD 21046
Phone: 443-741-3500
Fax: 443-741-3700

Baltimore Maryland
1502 Joh Avenue
Suite 100
Baltimore, MD 21227

Phone: 410-536-3653
Fax: 410-536-3654

Washington, D.C.

100 M Street SE
Suite 550
Washington, DC 20003

Phone: 202-570-7080
Fax: 202-697-5007

Vienna, Virginia

8150 Leesburg Pike
Suite 630
Vienna, VA 22182

Phone: 703-942-8990

AASHTO

2018 Sabra & Associates, Inc. | All rights reserved | Contact us